Officials Look For Answers After Yesterday’s Storm
New York, NY —
Governor Spitzer says the MTA needs to address "design problems" in the subway's drainage system that lead to the frequent floods on the tracks. Spitzer says this is the 3rd time in 7 months rain has overwhelmed the system. He's asking MTA CEO Lee Sander to prepare a report to suggest what can be done to avoid another system wide shut down.
BLOOMBERG: I've asked Lee and all the engineers at MTA to get back in a 30 day period to deal with drainage issue that clearly is one of a recurring nature.
REPORTER: Sander agreed to prepare the report. However he described the flooding as a 'perfect storm' underground. SANDER: The storm then hit right around high tide putting further pressure on our infrastructure finally the intensity of the storm brought torrential rain fall in a short period of time overwhelming both our pumps and the sewer system that is needed to accept and pump water.
REPORTER: Due to the millions of gallons of rain water running through the tunnels, every single subway line in the city experienced some sort of delay yesterday.


