Streams

Here's the New Subway Map, and Other Hurricane Sandy Recovery Details

Wednesday, October 31, 2012 - 01:17 PM

(IMPORTANT NOTE: The text is in this post doesn't reflect the latest service additions, which are occurring rapidly.  For full updates, please keep an eye on our transportation tracker.  The subway map above is self-updating, but there's a lag between service updates and the map. We're updating the tracker regularly.)

As of 11/2: The New York City subway opened Thursday for the first time since the nation's largest transit system preemptively shut down Sunday evening in preparation for the arrival of Hurricane Sandy. When power is restored, Governor Cuomo says service can be restored in two hours. Partial commuter rail service on Long Island Rail Road, Metro-North, and NJ Transit has restarted, joining city buses that have been running since Tuesday night.  Through Friday, all New York service will be free. A pdf map of the latest service can be found here.

Subway Service is operating on the 1, 2, 4, 5, 6, 7, the Times Square Shuttle, A, D, F, G, J, L (but not in Manhattan), M, N, and R trains. There will be no service on the 3, B, C, E, G and Q lines. Subways will run every ten minutes. There is still no subway service in Manhattan below 34th Street.

There will be 330 buses forming the "bus bridge" from Brooklyn crossing on the Brooklyn Williamsburg Bridge and heading up 3rd Avenue. Stops will be at 54th St, 42nd st, 33rd st, 23rd St, 14th St, 9th st, Delancey and Bowery, Spring and Bowery.  The buses will travel on special bus priority lanes, with 24 hour enforcement by NYPD, the NYC DOT says.

The Atlantic Avenue and Jay Street routes will operate via a new, two-way bus lane across the Manhattan Bridge and into Manhattan via bus-priority lanes on Bowery and Third Avenue all the way up to East 55th Street.  Outbound buses will travel down Lexington, East 23, and Third Avenue.

The shuttle bus from Hewes Street will operate over the Williamsburg Bridge and Delancey Street, then via Bowery and Third Avenue before returning downtown via Lexington Avenue, East 23rd Street, Third Avenue, and Bowery.
Per Governor Cuomo:

1 trains are operating local between 242nd Street (Bronx) and Times Square-42nd Street.

2 trains are operating between 241st Street (Bronx) and Times Square-42nd Street, with express service between 96th Street and Times Square.

3 trains are suspended.

4 trains will operate in two sections making all local stops: · Between Woodlawn (Bronx) and Grand Central-42nd Street
· Between Borough Hall and New Lots Avenue5 trains will operate express in Brooklyn between Atlantic Avenue-Barclays Center and Flatbush Avenue.

5 trains are operating between E. 180th St and Dyre Ave in the North Bronx; also in Brooklyn

6 trains are operating local between Pelham Bay Park and Grand Central-42nd Street.

7 trains are now running between Main Street and 74th Street - Broadway

42nd Street Shuttle S trains will operate between Times Square and Grand Central.

A trains will operate in two sections making all local stops:· Between 168th Street (Manhattan) and 34th Street-Penn Station
· Between Jay Street/MetroTech and Lefferts Blvd.
B and C service is suspended.

D trains operate in two sections:· Between 205th Street (Bronx) and 34th Street-Herald Square making all local stops
· In Brooklyn, between Atlantic Avenue-Barclays Center and Bay Parkway making express stops between Pacific Street and 36th Street

E trains are suspended.

F trains operate in two sections making all local stops:· Between 179th Street (Queens) and 34th Street-Herald Square
· In Brooklyn, between Jay Street-MetroTech and Avenue X

G trains are suspended.

J trains operate between Jamaica Center and Hewes Street making all local stops.

L trains operate between Broadway Junction and rockaway Parkway making all local stops.

M trains are running in two sections operate between Myrtle Avenue-Broadway and Metropolitan Avenue.

N trains operate between Ditmars Blvd. (Queens) and 34th Street-Herald Square making all local stops.

Q trains are suspended.

R trains operate in Brooklyn between Jay Street-MetroTech and 95th Street making all local stops.

Both the Franklin Avenue and Rockaway Park S shuttles are suspended.

SHUTTLE BUSES:
All shuttle buses will operate north on 3rd Avenue and south on Lexington Avenue.
1. Between Atlantic Avenue-Barclays Center and 57th Street-Lexington Avenue via the Manhattan Bridge
2. Between Jay Street-MetroTech and 57th Street-Lexington Avenue via the Manhattan Bridge
3. Between Hewes Street and 57th Street-Lexington Avenue via the Williamsburg Bridge

(We always put the latest updates in our Transit Tracker, so check there before you plan your commute.)

According to the MTA, buses will bridge the gaps in subway service, going over the Manhattan and Williamsburg Bridges. Commuters should add at least an hour to their commute times.

Three of the seven East River subway tunnels that were flooded have been cleared. The MTA is reporting that the tunnels carrying the 4, 5 and F trains are now dry. There will be no subways south of 34th Street in Manhattan where most neighborhoods are still without the power needed to run the subways.

MTA Chairman Joe Lhota said service would increase. "There will be more on Friday and even more on Saturday," he said Wednesday afternoon. He acknowledged that buses this morning were "packed" and "tight" as the the MTA tried to accommodate some of the 5.5 million daily subway riders without their normal way to work. Lhota said he would have bus ridership numbers later in the day, even though buses were not charging fares.

He said he is talking with city officials about instituting dedicated bus lanes.

Long Island Rail Road and Metro-North Railroad has begun to provide service. Metro-North is operating close to regularly scheduled service on: the Hudson Line, the Harlem Line, the New Haven Line. The LIRR info is below.

LIRR service will operate as follows:

The LIRR is providing hourly service on its four busiest branches: the Port Washington Branch, the Port Jefferson Branch from Huntington to Penn Station, the Ronkonkoma Branch and the Babylon Branch.

Brooklyn - (Jamaica-Brooklyn): Hourly service

City Terminal – (Jamaica - Penn Station): Suspended (anticipate shuttle between these stations later tonight)

Babylon Branch: hourly service between Babylon and Penn Station. Westbound trains depart Babylon at 35 minutes after the hour; the first train is at 12:35AM. Eastbound trains depart Penn 4 minutes after the hour; the first train is at 12:04AM. Schedule info here.

Huntington Branch: hourly service between Huntington and Penn Station. Westbound trains depart Huntington at 35 minutes after the hour; the first train is at 12:35AM. Eastbound trains depart Penn on the hour; the first train is at 12:00AM. Schedule info here.

Ronkonkoma Branch: Westbound trains departing Ronkonkoma 37 minutes after the hour. Eastbound trains depart Penn Station 9 minutes after the hour.

Port Washington Branch: Shuttle train service between Port Washington and Penn Station is continuing with westbound trains departing Port Washington every 35 minutes past the hour and eastbound trains departing Penn Station every 14 minutes past the hour.

SUSPENDED for now: service on the Montauk Branch, Hempstead Branch, Long Beach, Far Rockaway, Oyster Bay Branch, West Hempstead.

Keep checking our Transit Tracker for the latest information on service restoration.

Click for PDF of what subway service will look like Thursday

Tags:

The Morning Brief

Enter your email address and we’ll send you our top 5 stories every day, plus breaking news and weather.

Comments [6]

nick

i second that (a listener):
Could someone at WNYC please find out in the midst of all the reorg that’s going on..is the MTA going to reimburse the 30-Day Metro Card holders?
we know MTA lost money due to sandy but we all did.

Nov. 08 2012 06:29 PM
Liz

I cross the gw bridge ane take A train at 175 th st to go all the way down to chamber street. What is the best alternative way to chamber and church?

Nov. 04 2012 06:25 PM
Lee

I am interested in knowing about all the shuttle buses. My type of work is where I am commuting all day long, I travel from trains to buses in nyc all over. I have not been able to go to work due to the delays of trains and buses. I am a Health examiner where I see at least 10 per day all over the city, and can not be excessively late. Hpw do I get the bus schedules? I tried mta info and they talk about the recovery but not the stops or locations of each bus (or which ones will be running. It shows the east side buses not the west side. HELP

Nov. 02 2012 10:40 AM
David Thom

The A train yards flooded at 207th St, and the water followed the tracks down into Dyckman St station, which remains flooded. This is why there will be no A train service north of 168th for quite a while...

Nov. 01 2012 09:23 AM
a listener

Could someone at WNYC please find out in the midst of all the reorg that's going on..is the MTA going to reimburse the 30-Day Metro Card holders?
I bought a 30 day and haven't been able to board a single mode of public MTA transportation since the Shut-Down in Sunday...what is the MTA planning to do with us?

Oct. 31 2012 10:18 PM
Philair

Surprised Lhota, et al haven't put into place the same kind of contingency plans that were in effect during the '05 MTA strike (namely the HOV4 rule for vehicles entering Manhattan).

Oct. 31 2012 02:05 PM

Leave a Comment

Email addresses are required but never displayed.

Sponsored